Facts
| Name: | US 40 over E FK WHITEWATER R & PKWY |
| Structure number: | 014170 |
| Location: | 0.53 W US 27 |
| Purpose: | Carries highway and pedestrian walkway over highway and waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 120.1 ft. [36.6 m] |
| Total length: | 580.1 ft. [176.8 m] |
| Roadway width between curbs: | 62.7 ft. [19.1 m] |
| Deck width edge-to-edge: | 83.3 ft. [25.4 m] |
| Vertical clearance below bridge: | 14.4 ft. [4.4 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 2000 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 5 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 31,828 [as of 2004] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 81.2 tons [73.8 metric tons] |
| Inventory rating: | 48.5 tons [44.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 81.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 26,854 [as of 1994] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Serious [3 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 33.7 tons [30.6 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 24.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $3,753,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,600 [as of 1986] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 27.3 tons [24.8 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 29.1 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $4,948,000 |