Share:

ANTIOCH CHURCH Rd over BLACK River

Map 

Coordinates:
+38.20111, -87.72528
38°12'04" N, 87°43'31" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ANTIOCH CHURCH Rd over BLACK River
Structure number:2600283
Location:0.5 S of CEDAR GROVE Rd
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:60.0 ft. [18.3 m]
Total length:61.0 ft. [18.6 m]
Roadway width between curbs:17.4 ft. [5.3 m]
Deck width edge-to-edge:18.0 ft. [5.5 m]
Owner:County Highway Agency [02]
Year built:1910
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:65 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:6.9 tons [6.3 metric tons]
Inventory rating:5.0 tons [4.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:33.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$250,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:7.9 tons [7.2 metric tons]
Inventory rating:5.9 tons [5.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:36.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$5,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1990]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:11.9 tons [10.8 metric tons]
Inventory rating:9.9 tons [9.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:43.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$94,000