Facts 

Name:HONEYTOWN Rd over East Fork WHITE River
Structure number:3600053
Location:0.23 N of CR 100N
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:95.1 ft. [29.0 m]
Total length:458.0 ft. [139.6 m]
Roadway width between curbs:28.2 ft. [8.6 m]
Deck width edge-to-edge:30.5 ft. [9.3 m]
Skew angle:40°
Owner:County Highway Agency [02]
Year built:1983
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:781 [as of 2005]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:85.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$10,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:260 [as of 1996]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:200 [as of 1990]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.9