Facts
| Name: | Old SR 37N over BEANBLOSSOM Creek |
| Structure number: | 5300003 |
| Location: | 0.1 N of ROBINSON Rd |
| Purpose: | Carries highway over waterway |
| Route classification: | Major Collector (Rural) [07] |
| Length of largest span: | 77.1 ft. [23.5 m] |
| Total length: | 233.9 ft. [71.3 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 33.1 ft. [10.1 m] |
| Skew angle: | 30° |
| Owner: | County Highway Agency [02] |
| Year built: | 1994 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,127 [as of 2008] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 81.8 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,500 [as of 1997] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 82.0 |
| Estimated cost of work: | $2,000 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 1,700 [as of 1989] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Serious [3 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 9.9 tons [9.0 metric tons] |
| Inventory rating: | 7.9 tons [7.2 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 10.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $616,000 |