CR 175E over SUGAR Creek

Map 

Coordinates:
+40.08306, -86.87083
40°04'59" N, 86°52'15" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CR 175E over SUGAR Creek
Structure number:5400044
Location:1 S of CR 400N
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:77.4 ft. [23.6 m]
Total length:225.1 ft. [68.6 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:28.9 ft. [8.8 m]
Owner:County Highway Agency [02]
Year built:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:225 [as of 1998]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:99.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$4,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:225 [as of 1998]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$2,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:100 [as of 1986]
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:4.0 tons [3.6 metric tons]
Inventory rating:3.0 tons [2.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:20.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$440,000