PUMPKIN RUN Rd over BLACK River
Map
Coordinates:
+38.22611, -87.8177838°13'34" N, 87°49'04" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | PUMPKIN RUN Rd over BLACK River |
| Structure number: | 6500193 |
| Location: | 0 Int of 1285N 550E |
| Purpose: | Carries highway over waterway |
| Route classification: | Minor Collector (Rural) [08] |
| Length of largest span: | 42.0 ft. [12.8 m] |
| Total length: | 107.0 ft. [32.6 m] |
| Roadway width between curbs: | 23.6 ft. [7.2 m] |
| Deck width edge-to-edge: | 24.3 ft. [7.4 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1996 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Precast Panels [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 125 [as of 2002] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 89.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 125 [as of 1998] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 44.6 tons [40.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 92.0 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 100 [as of 1985] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 13.9 tons [12.6 metric tons] |
| Inventory rating: | 9.9 tons [9.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 43.6 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,000 |