Share:

CR 100N over WABASH River

Map 

Coordinates:
+40.84250, -85.64750
40°50'33" N, 85°38'51" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CR 100N over WABASH River
Structure number:8500135
Location:0.5 S of US 24
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:96.1 ft. [29.3 m]
Total length:415.0 ft. [126.5 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:22.6 ft. [6.9 m]
Vertical clearance below bridge:38.1 ft. [11.6 m]
Owner:County Highway Agency [02]
Year built:1899
Year reconstructed:1993
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:210 [as of 2008]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:84.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$9,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:200 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:84.8
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$6,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:200 [as of 1989]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:15.8 tons [14.4 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:27.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,051,000