Share:

RS 191 S24-E15 over CARY CREEK

Map 

Coordinates:
+38.79812, -97.03538
38°47'53" N, 97°02'07" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RS 191 S24-E15 over CARY CREEK
Structure number:000000000210460
Location:3.9W OF WOODBINE
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:47.9 ft. [14.6 m]
Total length:123.0 ft. [37.5 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:32.2 ft. [9.8 m]
Skew angle:30°
Owner:County Highway Agency [02]
Year built:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:530 [as of 2007]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Sufficiency rating:93.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$571,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:530 [as of 1996]
Truck traffic:10% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:45.9 tons [41.7 metric tons]
Inventory rating:27.9 tons [25.4 metric tons]
Sufficiency rating:88.6

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:580 [as of 1975]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:7.9 tons [7.2 metric tons]
Inventory rating:3.0 tons [2.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:20.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$197,000