RS 191 S24-E15 over CARY CREEK
Map
Coordinates:
+38.79812, -97.0353838°47'53" N, 97°02'07" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | RS 191 S24-E15 over CARY CREEK |
| Structure number: | 000000000210460 |
| Location: | 3.9W OF WOODBINE |
| Purpose: | Carries highway over waterway |
| Route classification: | Major Collector (Rural) [07] |
| Length of largest span: | 47.9 ft. [14.6 m] |
| Total length: | 123.0 ft. [37.5 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 32.2 ft. [9.8 m] |
| Skew angle: | 30° |
| Owner: | County Highway Agency [02] |
| Year built: | 1994 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 530 [as of 2007] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 45.5 tons [41.4 metric tons] |
| Inventory rating: | 27.7 tons [25.2 metric tons] |
| Sufficiency rating: | 93.3 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $571,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 530 [as of 1996] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Excellent [9 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 45.9 tons [41.7 metric tons] |
| Inventory rating: | 27.9 tons [25.4 metric tons] |
| Sufficiency rating: | 88.6 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 580 [as of 1975] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 7.9 tons [7.2 metric tons] |
| Inventory rating: | 3.0 tons [2.7 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 20.8 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $197,000 |