FAS290 PlumCre 456 over MARIAS DES CYGNES RIVER

Map 

Coordinates:
+38.50295, -94.95515
38°30'11" N, 94°57'19" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAS290 PlumCre 456 over MARIAS DES CYGNES RIVER
Structure number:000000000610290
Location:N. EDGE OF OSAWATOMIE
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:140.1 ft. [42.7 m]
Total length:316.0 ft. [96.3 m]
Roadway width between curbs:19.7 ft. [6.0 m]
Deck width edge-to-edge:25.6 ft. [7.8 m]
Vertical clearance above deck:24.9 ft. [7.6 m]
Owner:County Highway Agency [02]
Year built:1930
Historic significance:Bridge is on the National Register of Historic Places [1]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Arch - Thru [12]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:1,800 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:27.0 tons [24.5 metric tons]
Inventory rating:17.9 tons [16.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:27.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,100,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:2,200 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:27.0 tons [24.5 metric tons]
Inventory rating:17.9 tons [16.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:45.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$738,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:850 [as of 1988]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:55.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]