Share:

EE RD. over UNNAMED STREAM

Map 

Coordinates:
+39.58415, -100.05718
39°35'03" N, 100°03'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:EE RD. over UNNAMED STREAM
Structure number:000330527803600
Location:2.5S 2.8W OF LENORA
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:28.9 ft. [8.8 m]
Total length:30.8 ft. [9.4 m]
Roadway width between curbs:18.0 ft. [5.5 m]
Deck width edge-to-edge:18.4 ft. [5.6 m]
Owner:County Highway Agency [02]
Year built:1930
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Gravel [8]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:5 [as of 2004]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:11.9 tons [10.8 metric tons]
Inventory rating:6.9 tons [6.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:35.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$66,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:5 [as of 1995]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:12.0 tons [10.9 metric tons]
Inventory rating:7.0 tons [6.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:35.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$66,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:5 [as of 1983]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:5.0 tons [4.5 metric tons]
Inventory rating:3.0 tons [2.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:35.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$66,000