M RD. over UNNAMED STREAM
Map
Coordinates:
+39.30588, -99.9376639°18'21" N, 99°56'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | M RD. over UNNAMED STREAM |
| Structure number: | 000330541103960 |
| Location: | 3.0S 2.1E OF PENOKEE |
| Purpose: | Carries highway over waterway |
| Route classification: | Minor Collector (Rural) [08] |
| Length of largest span: | 40.0 ft. [12.2 m] |
| Total length: | 182.1 ft. [55.5 m] |
| Roadway width between curbs: | 23.6 ft. [7.2 m] |
| Deck width edge-to-edge: | 24.3 ft. [7.4 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1965 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 5 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 45 [as of 2004] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 30.7 tons [27.9 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 77.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $112,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 45 [as of 1995] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 30.9 tons [28.1 metric tons] |
| Inventory rating: | 27.0 tons [24.5 metric tons] |
| Sufficiency rating: | 88.7 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 45 [as of 1980] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Sufficiency rating: | 93.0 |