Share:

CENTRAL(WB) over WICHITA DRAINAGE CANAL

Map 

Coordinates:
+37.69333, -97.31167
37°41'36" N, 97°18'42" W
Source: National Bridge Inventory (2010 edition)
Information not verified. Use at your own risk.

Facts 

Name:CENTRAL(WB) over WICHITA DRAINAGE CANAL
Structure number:430400876400059
Location:CENTRAL AT I-135
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:47.9 ft. [14.6 m]
Total length:123.0 ft. [37.5 m]
Roadway width between curbs:27.2 ft. [8.3 m]
Deck width edge-to-edge:44.3 ft. [13.5 m]
Skew angle:14°
Owner:City or Municipal Highway Agency [04]
Year built:1971
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,000 [as of 2006]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:88.8 tons [80.7 metric tons]
Inventory rating:53.9 tons [49.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$3,000