Share:

GEO WASHINGTON BLD over GYPSUM CREEK

Map 

Coordinates:
+37.64749, -97.28549
37°38'51" N, 97°17'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GEO WASHINGTON BLD over GYPSUM CREEK
Structure number:430400876810010
Location:GEO. WASH. AT ROSS PKWY
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:69.9 ft. [21.3 m]
Total length:193.9 ft. [59.1 m]
Roadway width between curbs:49.2 ft. [15.0 m]
Deck width edge-to-edge:64.3 ft. [19.6 m]
Skew angle:35°
Owner:City or Municipal Highway Agency [04]
Year built:1934
Year reconstructed:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,400 [as of 2006]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:69.9 tons [63.5 metric tons]
Inventory rating:63.9 tons [58.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$820,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,394 [as of 1995]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:53.9 tons [49.0 metric tons]
Inventory rating:47.9 tons [43.5 metric tons]
Sufficiency rating:80.1

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:7,444 [as of 1988]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:17.4 tons [15.8 metric tons]
Inventory rating:12.4 tons [11.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:45.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$357,000