JAMES STREET VIA. over MO-PAC RAILROAD YARD

Map 

Coordinates:
+39.10167, -94.60806
39°06'06" N, 94°36'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:JAMES STREET VIA. over MO-PAC RAILROAD YARD
Structure number:514301050000234
Location:JAMES ST OVER MO PAC RR
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:98.1 ft. [29.9 m]
Total length:642.1 ft. [195.7 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:39.0 ft. [11.9 m]
Vertical clearance below bridge:23.3 ft. [7.1 m]
Owner:County Highway Agency [02]
Year built:1982
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:9
Main spans material:Concrete [1]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,925 [as of 1998]
Truck traffic:60% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.0 tons [31.8 metric tons]
Sufficiency rating:79.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,873 [as of 1992]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.9 tons [53.5 metric tons]
Inventory rating:35.0 tons [31.8 metric tons]
Sufficiency rating:79.1

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,988 [as of 1989]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:34.7 tons [31.5 metric tons]
Sufficiency rating:78.4
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,281,000