SOUTH BROADWAY(SB) over ARKANSAS RIVER

Map 

Coordinates:
+37.64529, -97.33552
37°38'43" N, 97°20'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SOUTH BROADWAY(SB) over ARKANSAS RIVER
Structure number:53040087000AR30
Location:SOUTH BROADWAY @ CARP ST.
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:100.1 ft. [30.5 m]
Total length:799.9 ft. [243.8 m]
Roadway width between curbs:26.2 ft. [8.0 m]
Deck width edge-to-edge:48.6 ft. [14.8 m]
Vertical clearance above deck:21.0 ft. [6.4 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1931
Year reconstructed:1996
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Number of main spans:8
Main spans material:Concrete [1]
Main spans design:Arch - Thru [12]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,300 [as of 2006]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:47.9 tons [43.5 metric tons]
Inventory rating:27.9 tons [25.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.9
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$150,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,985 [as of 1995]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:38.0 tons [34.5 metric tons]
Inventory rating:22.0 tons [20.0 metric tons]
Sufficiency rating:57.3

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:17,687 [as of 1988]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:18.6 tons [16.9 metric tons]
Inventory rating:12.4 tons [11.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:12.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,804,000