WOODLAWN over GYPSUM CREEK
Map
Coordinates:
+37.65965, -97.2621437°39'35" N, 97°15'44" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | WOODLAWN over GYPSUM CREEK |
| Structure number: | 53040087000GC80 |
| Location: | WOODLAWN AT SKINNER |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 45.9 ft. [14.0 m] |
| Total length: | 131.9 ft. [40.2 m] |
| Roadway width between curbs: | 52.5 ft. [16.0 m] |
| Deck width edge-to-edge: | 64.6 ft. [19.7 m] |
| Skew angle: | 15° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1972 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 18 / H 20 [4] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,000 [as of 2006] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 49.9 tons [45.4 metric tons] |
| Inventory rating: | 45.9 tons [41.7 metric tons] |
| Sufficiency rating: | 78.7 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $125,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,157 [as of 1995] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 45.9 tons [41.7 metric tons] |
| Inventory rating: | 41.9 tons [38.1 metric tons] |
| Sufficiency rating: | 78.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,635 [as of 1988] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 47.5 tons [43.2 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 80.0 |