Facts 

Name:33RD STREET NORTH over CHISHOLM CREEK
Structure number:530400870WDCW60
Location:33RD ST NO AT WACO
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:40.0 ft. [12.2 m]
Total length:100.1 ft. [30.5 m]
Roadway width between curbs:30.2 ft. [9.2 m]
Deck width edge-to-edge:42.3 ft. [12.9 m]
Skew angle:45°
Owner:City or Municipal Highway Agency [04]
Year built:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,500 [as of 2006]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:77.2 tons [70.2 metric tons]
Inventory rating:42.5 tons [38.6 metric tons]
Sufficiency rating:95.1

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:1,200 [as of 1995]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:24.0 tons [21.8 metric tons]
Inventory rating:15.0 tons [13.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:28.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$255,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:1,050 [as of 1980]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Sufficiency rating:65.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$174,000