K-5 HIGHWAY over 10TH STREET

Map 

Coordinates:
+39.14196, -94.63486
39°08'31" N, 94°38'05" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:K-5 HIGHWAY over 10TH STREET
Structure number:999900501051921
Location:0.83 MI W OF US69
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:109.9 ft. [33.5 m]
Total length:251.3 ft. [76.6 m]
Roadway width between curbs:74.5 ft. [22.7 m]
Deck width edge-to-edge:79.4 ft. [24.2 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:39°
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,490 [as of 2009]
Truck traffic:14% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:77.9 tons [70.8 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Sufficiency rating:97.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$646,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,190 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Sufficiency rating:97.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,429,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,290 [as of 1990]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.5 tons [55.9 metric tons]
Inventory rating:33.0 tons [30.0 metric tons]
Sufficiency rating:96.7