Share:

K-18 HWY over SOUTH FORK SOLOMON RIVER

Map 

Coordinates:
+39.37022, -99.68745
39°22'13" N, 99°41'15" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:K-18 HWY over SOUTH FORK SOLOMON RIVER
Structure number:999901800330441
Location:0.69 MI S US-24
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:89.9 ft. [27.4 m]
Total length:623.4 ft. [190.0 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:38.1 ft. [11.6 m]
Owner:State Highway Agency [01]
Year built:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:7
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,080 [as of 2009]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:63.9 tons [58.1 metric tons]
Inventory rating:38.0 tons [34.5 metric tons]
Sufficiency rating:100.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$774,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,065 [as of 1999]
Truck traffic:12% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Sufficiency rating:100.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,223,000