Share:

I35 HWY, NB over TURKEY CR, MILL STREET

Map 

Coordinates:
+39.05543, -94.63129
39°03'20" N, 94°37'53" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:I35 HWY, NB over TURKEY CR, MILL STREET
Structure number:999903501050081
Location:1.01 MI NE US69SL
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:71.9 ft. [21.9 m]
Total length:395.4 ft. [120.5 m]
Roadway width between curbs:62.0 ft. [18.9 m]
Deck width edge-to-edge:65.3 ft. [19.9 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:32°
Owner:State Highway Agency [01]
Year built:1961
Year reconstructed:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:7
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2014 

Status:Open, no restriction [A]
Average daily traffic:54,000 [as of 2014]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Equal to present minimum criteria [6]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:61.9 tons [56.3 metric tons]
Inventory rating:37.0 tons [33.6 metric tons]
Sufficiency rating:89.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$845,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
June 201489.8Not deficientGoodGoodGood54000
June 201290.2Not deficientGoodVery GoodGood49900
June 201091.9Not deficientGoodVery GoodGood54000
June 200892.0Not deficientGoodVery GoodVery Good53500
June 200690.0Not deficientGoodVery GoodVery Good52000
July 200489.7Not deficientGoodVery GoodVery Good55500
May 200289.9Not deficientGoodVery GoodVery Good53500
May 200089.5Not deficientGoodVery GoodVery Good56865
June 199889.5Not deficientGoodVery GoodVery Good56865
November 199682.7Not deficientGoodVery GoodVery Good45560
August 199492.4Not deficientGoodVery GoodVery Good47405
February 199294.7Not deficientGoodVery GoodVery Good43790
June 199091.1Not deficientVery GoodVery GoodVery Good37710