Share:

US54/US400 HWY EB over GROVE ST EL-WL

Map 

Coordinates:
+37.67932, -97.30811
37°40'46" N, 97°18'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US54/US400 HWY EB over GROVE ST EL-WL
Structure number:999905400873001
Location:US54 & GROVE ST
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:46.9 ft. [14.3 m]
Total length:168.6 ft. [51.4 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:54.1 ft. [16.5 m]
Vertical clearance below bridge:17.4 ft. [5.3 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:37,150 [as of 2009]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:77.9 tons [70.8 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Sufficiency rating:97.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$302,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,365 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Sufficiency rating:96.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$961,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,745 [as of 1990]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Sufficiency rating:97.0