WB U54/WN-WS RAMP over GROVE ST

Map 

Coordinates:
+37.67887, -97.30832
37°40'44" N, 97°18'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WB U54/WN-WS RAMP over GROVE ST
Structure number:999905400873011
Location:KELLOGG & GROVE
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:46.9 ft. [14.3 m]
Total length:168.6 ft. [51.4 m]
Roadway width between curbs:64.0 ft. [19.5 m]
Deck width edge-to-edge:65.9 ft. [20.1 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1976
Year reconstructed:2009
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:74,300 [as of 2009]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:77.9 tons [70.8 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Sufficiency rating:98.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$372,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,365 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Sufficiency rating:97.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$961,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,745 [as of 1990]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Sufficiency rating:97.0