54 RAMP W-S I135 over HYDRAULIC AVE

Map 

Coordinates:
+37.67869, -97.31722
37°40'43" N, 97°19'02" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:54 RAMP W-S I135 over HYDRAULIC AVE
Structure number:999905400873031
Location:US54 & HYDRAULIC AVE
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:73.5 ft. [22.4 m]
Total length:163.1 ft. [49.7 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:38.1 ft. [11.6 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:12°
Owner:State Highway Agency [01]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:52,000 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:83.8 tons [76.2 metric tons]
Inventory rating:50.9 tons [46.3 metric tons]
Sufficiency rating:97.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$202,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,604 [as of 1986]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:83.2 tons [75.6 metric tons]
Inventory rating:50.5 tons [45.9 metric tons]
Sufficiency rating:96.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$928,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,604 [as of 1986]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:38.1 tons [34.6 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Sufficiency rating:95.0