US54/US400 HWY WB over HILLSIDE AVE
Map
Coordinates:
+37.67925, -97.2989237°40'45" N, 97°17'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US54/US400 HWY WB over HILLSIDE AVE |
| Structure number: | 999905400873131 |
| Location: | 0.80 MI E JCT I135/US54 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 99.1 ft. [30.2 m] |
| Total length: | 200.5 ft. [61.1 m] |
| Roadway width between curbs: | 51.8 ft. [15.8 m] |
| Deck width edge-to-edge: | 54.5 ft. [16.6 m] |
| Vertical clearance below bridge: | 16.1 ft. [4.9 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1977 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 37,150 [as of 2009] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 69.9 tons [63.5 metric tons] |
| Inventory rating: | 38.9 tons [35.4 metric tons] |
| Sufficiency rating: | 93.4 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $360,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25,910 [as of 1999] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 69.3 tons [63.0 metric tons] |
| Inventory rating: | 38.6 tons [35.1 metric tons] |
| Sufficiency rating: | 92.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,144,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25,055 [as of 1990] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 38.1 tons [34.6 metric tons] |
| Inventory rating: | 28.5 tons [25.9 metric tons] |
| Sufficiency rating: | 94.1 |