Facts 

Name:US-54 HWY NW RAMP over WATER ST
Structure number:999905400873741
Location:0.39 MI E SYCAMORE ST
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:105.0 ft. [32.0 m]
Total length:295.6 ft. [90.1 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:28.5 ft. [8.7 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Owner:State Highway Agency [01]
Year built:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:51,000 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.8 tons [54.4 metric tons]
Inventory rating:44.9 tons [40.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$265,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1 [as of 1999]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Sufficiency rating:86.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,072,000