Facts 

Name:US54/US400 HWY WB over MOPAC & SW BLVD, EDWARDS
Structure number:999905400873801
Location:JCT US-54 WB/C6353
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:87.9 ft. [26.8 m]
Total length:410.1 ft. [125.0 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:56.8 ft. [17.3 m]
Vertical clearance below bridge:26.6 ft. [8.1 m]
Skew angle:22°
Owner:State Highway Agency [01]
Year built:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:47,800 [as of 2009]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:87.8 tons [79.8 metric tons]
Inventory rating:51.9 tons [47.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.2
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$764,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:56,595 [as of 1999]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:87.1 tons [79.2 metric tons]
Inventory rating:51.5 tons [46.8 metric tons]
Sufficiency rating:90.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,334,000