US54/US400 HWY EB over URB6275, MERIDIAN AVE
Map
Coordinates:
+37.67526, -97.3711137°40'31" N, 97°22'16" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US54/US400 HWY EB over URB6275, MERIDIAN AVE |
| Structure number: | 999905400873831 |
| Location: | 0.13 MI E K-42, EB |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 82.0 ft. [25.0 m] |
| Total length: | 181.4 ft. [55.3 m] |
| Roadway width between curbs: | 54.1 ft. [16.5 m] |
| Deck width edge-to-edge: | 56.8 ft. [17.3 m] |
| Vertical clearance below bridge: | 17.7 ft. [5.4 m] |
| Skew angle: | 7° |
| Owner: | State Highway Agency [01] |
| Year built: | 1993 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 22.5 / HS 25 [9] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 47,800 [as of 2009] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 74.8 tons [68.0 metric tons] |
| Inventory rating: | 44.9 tons [40.8 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 91.3 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $338,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 56,595 [as of 1999] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 74.2 tons [67.5 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 90.4 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,036,000 |