US69 HWY, NB over MERRIAM LN,TURKEY CREEK
Map
Coordinates:
+39.05053, -94.6472239°03'02" N, 94°38'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US69 HWY, NB over MERRIAM LN,TURKEY CREEK |
| Structure number: | 999906901051301 |
| Location: | JCT MERRIAM LN/US69 |
| Purpose: | Carries highway over highway and waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 119.1 ft. [36.3 m] |
| Total length: | 473.1 ft. [144.2 m] |
| Roadway width between curbs: | 60.4 ft. [18.4 m] |
| Deck width edge-to-edge: | 65.3 ft. [19.9 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Skew angle: | 27° |
| Owner: | State Highway Agency [01] |
| Year built: | 1959 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,800 [as of 2009] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 60.8 tons [55.3 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 90.7 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $986,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 31,820 [as of 1999] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 60.4 tons [54.9 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 88.7 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,692,000 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 10,680 [as of 1990] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 19.8 tons [18.0 metric tons] |
| Inventory rating: | 19.8 tons [18.0 metric tons] |
| Sufficiency rating: | 62.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,692,000 |