Share:

US69 HWY, NB over MERRIAM LN,TURKEY CREEK

Map 

Coordinates:
+39.05053, -94.64722
39°03'02" N, 94°38'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US69 HWY, NB over MERRIAM LN,TURKEY CREEK
Structure number:999906901051301
Location:JCT MERRIAM LN/US69
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:119.1 ft. [36.3 m]
Total length:473.1 ft. [144.2 m]
Roadway width between curbs:60.4 ft. [18.4 m]
Deck width edge-to-edge:65.3 ft. [19.9 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:27°
Owner:State Highway Agency [01]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,800 [as of 2009]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:60.8 tons [55.3 metric tons]
Inventory rating:36.0 tons [32.7 metric tons]
Sufficiency rating:90.7
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$986,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,820 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:88.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,692,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:10,680 [as of 1990]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Sufficiency rating:62.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,692,000