Share:

69 HYW (18TH ST) over R32, UP& KCS RRS,2 ST

Map 

Coordinates:
+39.08740, -94.64928
39°05'15" N, 94°38'57" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:69 HYW (18TH ST) over R32, UP& KCS RRS,2 ST
Structure number:999906901051421
Location:0.36 MILES S I-70
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:152.6 ft. [46.5 m]
Total length:2644.5 ft. [806.0 m]
Roadway width between curbs:75.5 ft. [23.0 m]
Deck width edge-to-edge:78.4 ft. [23.9 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:31
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,000 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:96.8 tons [88.0 metric tons]
Inventory rating:57.9 tons [52.6 metric tons]
Sufficiency rating:82.4
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$6,888,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:36,760 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:96.0 tons [87.3 metric tons]
Inventory rating:57.4 tons [52.2 metric tons]
Sufficiency rating:78.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$15,057,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:8,400 [as of 1990]
Truck traffic:5% of total traffic
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:9.9 tons [9.0 metric tons]
Sufficiency rating:12.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$15,057,000