US69 (18TH ST) NB over I35 HWY
Map
Coordinates:
+39.04761, -94.6463939°02'51" N, 94°38'47" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US69 (18TH ST) NB over I35 HWY |
| Structure number: | 999906901052831 |
| Location: | JCT I35 & US69 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 79.1 ft. [24.1 m] |
| Total length: | 248.0 ft. [75.6 m] |
| Roadway width between curbs: | 45.9 ft. [14.0 m] |
| Deck width edge-to-edge: | 47.6 ft. [14.5 m] |
| Vertical clearance below bridge: | 16.1 ft. [4.9 m] |
| Skew angle: | 2° |
| Owner: | State Highway Agency [01] |
| Year built: | 1986 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,400 [as of 2009] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 93.3 tons [84.8 metric tons] |
| Inventory rating: | 55.6 tons [50.5 metric tons] |
| Sufficiency rating: | 98.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $394,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,910 [as of 1999] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 93.1 tons [84.6 metric tons] |
| Inventory rating: | 55.4 tons [50.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 79.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,411,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,340 [as of 1990] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Sufficiency rating: | 95.0 |