Share:

I-70 WB HIGHWAY over US-169 & US-69 NB

Map 

Coordinates:
+39.09430, -94.62610
39°05'39" N, 94°37'34" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-70 WB HIGHWAY over US-169 & US-69 NB
Structure number:999907001050241
Location:I70/US169 & US69 E JCT
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:104.3 ft. [31.8 m]
Total length:274.0 ft. [83.5 m]
Roadway width between curbs:56.8 ft. [17.3 m]
Deck width edge-to-edge:59.4 ft. [18.1 m]
Vertical clearance below bridge:16.1 ft. [4.9 m]
Skew angle:43°
Owner:State Highway Agency [01]
Year built:1957
Year reconstructed:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,550 [as of 2009]
Truck traffic:21% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.8 tons [81.6 metric tons]
Inventory rating:53.9 tons [49.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:86.9
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$536,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,050 [as of 1999]
Truck traffic:23% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:89.1 tons [81.0 metric tons]
Inventory rating:53.5 tons [48.6 metric tons]
Sufficiency rating:87.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,417,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,245 [as of 1990]
Truck traffic:17% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:50.1 tons [45.5 metric tons]
Inventory rating:27.8 tons [25.3 metric tons]
Sufficiency rating:73.7
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$510,000