WB I70-NBND FRFX over 7 R.R TRACKS

Map 

Coordinates:
+39.11278, -94.61369
39°06'46" N, 94°36'49" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WB I70-NBND FRFX over 7 R.R TRACKS
Structure number:999907001051731
Location:0.49 MILES W MO ST LINE
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:299.9 ft. [91.4 m]
Total length:1664.1 ft. [507.2 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Vertical clearance below bridge:28.9 ft. [8.8 m]
Owner:State Highway Agency [01]
Year built:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Steel [3]
Main span design:Truss - Deck [09]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for other load-capacity restriction [R]
Average daily traffic:23,150 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:41.7 tons [37.9 metric tons]
Inventory rating:35.0 tons [31.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:59.2
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,148,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,800 [as of 1999]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:57.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$8,611,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,800 [as of 1990]
Truck traffic:17% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:38.1 tons [34.6 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.2
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$3,195,000