I-70 WB HIGHWAY over 69 SB HWY (18TH STREET)

Map 

Coordinates:
+39.09618, -94.64918
39°05'46" N, 94°38'57" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-70 WB HIGHWAY over 69 SB HWY (18TH STREET)
Structure number:999907001052383
Location:I-70 / US-69 W JCT
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:103.0 ft. [31.4 m]
Total length:226.7 ft. [69.1 m]
Roadway width between curbs:79.1 ft. [24.1 m]
Deck width edge-to-edge:81.7 ft. [24.9 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:19°
Owner:State Toll Authority [31]
Year built:1980
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:35,500 [as of 2009]
Truck traffic:14% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.9 tons [45.4 metric tons]
Inventory rating:29.9 tons [27.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:89.1
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$618,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,205 [as of 1999]
Truck traffic:13% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:88.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,174,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,550 [as of 1990]
Truck traffic:14% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.0