I-70 EB ON RP 3-E over RR YARD
Map
Coordinates:
+39.11141, -94.6117939°06'41" N, 94°36'42" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-70 EB ON RP 3-E over RR YARD |
| Structure number: | 999907001052901 |
| Location: | .04 MI E OF CNTRL AVE/I70 |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 36.1 ft. [11.0 m] |
| Total length: | 97.8 ft. [29.8 m] |
| Roadway width between curbs: | 26.2 ft. [8.0 m] |
| Deck width edge-to-edge: | 28.9 ft. [8.8 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1993 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Concrete [1] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 18,800 [as of 2009] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 97.8 tons [88.9 metric tons] |
| Inventory rating: | 58.9 tons [53.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 90.5 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $89,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1 [as of 1999] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 97.0 tons [88.2 metric tons] |
| Inventory rating: | 58.4 tons [53.1 metric tons] |
| Sufficiency rating: | 92.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $507,000 |