Share:

K-96 HWY WB over HYDRAULIC ST

Map 

Coordinates:
+37.74369, -97.31739
37°44'37" N, 97°19'03" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:K-96 HWY WB over HYDRAULIC ST
Structure number:999909600873911
Location:K-96 WB OVER HYDRAULIC
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:120.1 ft. [36.6 m]
Total length:282.5 ft. [86.1 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:26.6 ft. [8.1 m]
Vertical clearance below bridge:26.9 ft. [8.2 m]
Owner:State Highway Agency [01]
Year built:1992
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,600 [as of 2009]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:86.8 tons [78.9 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:93.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$234,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,145 [as of 1999]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:90.1 tons [81.9 metric tons]
Inventory rating:54.5 tons [49.5 metric tons]
Sufficiency rating:96.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,611,000