I135 HWY SB over I235 SB
Map
Coordinates:
+37.61497, -97.3283537°36'54" N, 97°19'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I135 HWY SB over I235 SB |
| Structure number: | 999913500870021 |
| Location: | 0.51 MI N 47TH ST, SB |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 115.2 ft. [35.1 m] |
| Total length: | 308.4 ft. [94.0 m] |
| Roadway width between curbs: | 40.0 ft. [12.2 m] |
| Deck width edge-to-edge: | 42.7 ft. [13.0 m] |
| Vertical clearance below bridge: | 16.7 ft. [5.1 m] |
| Skew angle: | 64° |
| Owner: | State Highway Agency [01] |
| Year built: | 1965 |
| Year reconstructed: | 1991 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,250 [as of 2009] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 60.8 tons [55.3 metric tons] |
| Inventory rating: | 36.0 tons [32.7 metric tons] |
| Sufficiency rating: | 98.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $426,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 16,275 [as of 1999] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 79.2 tons [72.0 metric tons] |
| Inventory rating: | 46.5 tons [42.3 metric tons] |
| Sufficiency rating: | 98.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,599,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 11,970 [as of 1990] |
| Truck traffic: | 13% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.5 tons [32.3 metric tons] |
| Inventory rating: | 22.2 tons [20.2 metric tons] |
| Sufficiency rating: | 79.6 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $426,000 |