Share:

I135 HWY SB over UP RR, CHISHOLM CR DRG

Map 

Coordinates:
+37.73557, -97.31735
37°44'08" N, 97°19'02" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I135 HWY SB over UP RR, CHISHOLM CR DRG
Structure number:999913500870241
Location:1.00 MI N 21ST, WL
Purpose:Carries highway over railroad and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:153.6 ft. [46.8 m]
Total length:508.9 ft. [155.1 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:59.1 ft. [18.0 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Skew angle:35°
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,000 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:65.9 tons [59.9 metric tons]
Inventory rating:38.0 tons [34.5 metric tons]
Sufficiency rating:94.1
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$983,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:37,380 [as of 1999]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Sufficiency rating:85.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,634,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,975 [as of 1990]
Truck traffic:8% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:52.0 tons [47.3 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:92.2