Share:

I135 HWY NB over UP RR,CHISHOLM CR DRG

Map 

Coordinates:
+37.73574, -97.31711
37°44'09" N, 97°19'02" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:I135 HWY NB over UP RR,CHISHOLM CR DRG
Structure number:999913500870251
Location:1.01 MI N 21ST NB
Purpose:Carries highway over railroad and waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:151.9 ft. [46.3 m]
Total length:515.1 ft. [157.0 m]
Roadway width between curbs:89.9 ft. [27.4 m]
Deck width edge-to-edge:92.9 ft. [28.3 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Skew angle:31°
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:2002
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: August 2014 

Status:Open, no restriction [A]
Average daily traffic:33,550 [as of 2014]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Superior to present desirable criteria [9]
Underclearances appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:64.9 tons [59.0 metric tons]
Inventory rating:38.9 tons [35.4 metric tons]
Sufficiency rating:93.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$1,599,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
August 201493.8Not deficientSatisfactoryGoodGood33550
March 201393.9Not deficientSatisfactoryGoodGood32700
August 201288.9Not deficientSatisfactoryGoodGood31600
September 201089.0Not deficientSatisfactoryGoodGood30350
August 200989.0Not deficientGoodGoodGood31000
August 200859.3Not deficientGoodPoorGood32000
September 200759.2Not deficientGoodPoorGood32600
August 200688.5Not deficientGoodGoodGood32400
August 200488.5Not deficientGoodGoodGood31680
August 200267.9Not deficientGoodGoodGood38325
May 200068.0Not deficientGoodGoodGood37380
August 199868.0Not deficientGoodGoodGood37380
March 199674.2Not deficientGoodGoodGood31540
July 199475.8Not deficientGoodGoodGood23120
April 199276.9Not deficientFairGoodGood21465
March 199276.0Not deficientFairGoodGood20555
May 199072.5Not deficientFairGoodGood21975