Share:

I135 HWY SB over RR , 12CITY ST& STRM

Map 

Coordinates:
+37.69617, -97.31655
37°41'46" N, 97°18'60" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:I135 HWY SB over RR , 12CITY ST& STRM
Structure number:999913500872901
Location:I135 WL VDT, ENG TO 18TH
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:106.0 ft. [32.3 m]
Total length:12497.3 ft. [3809.0 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:54.5 ft. [16.6 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1977
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:203
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Epoxy Overlay [5]

Latest Available Inspection: August 2014 

Status:Open, no restriction [A]
Average daily traffic:47,300 [as of 2014]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:65.9 tons [59.9 metric tons]
Inventory rating:38.9 tons [35.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.3
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$22,419,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
August 201476.3Functionally obsoleteGoodGoodGood47300
August 201276.3Functionally obsoleteVery GoodGoodVery Good43600
August 201076.3Functionally obsoleteVery GoodGoodVery Good42750
September 200876.3Functionally obsoleteVery GoodGoodVery Good44350
August 200676.3Functionally obsoleteGoodGoodVery Good45750
August 200476.3Functionally obsoleteGoodGoodVery Good46250
August 200275.5Functionally obsoleteGoodGoodGood41300
May 200075.5Functionally obsoleteGoodGoodVery Good44745
August 199875.5Functionally obsoleteGoodGoodVery Good44745
June 199676.3Functionally obsoleteGoodGoodVery Good38470
July 199486.8Functionally obsoleteGoodGoodVery Good36490
March 199291.6Functionally obsoleteVery GoodVery GoodVery Good30160
May 199091.6Functionally obsoleteVery GoodGoodVery Good29750