Share:

EB PWNE-NBI135RP over HWY R/W ONLY

Map 

Coordinates:
+37.64993, -97.30998
37°38'60" N, 97°18'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:EB PWNE-NBI135RP over HWY R/W ONLY
Structure number:999913500873371
Location:0.70 MI N OF K15
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:89.9 ft. [27.4 m]
Total length:322.5 ft. [98.3 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Skew angle:13°
Owner:State Highway Agency [01]
Year built:1967
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:30,600 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:92.8 tons [84.4 metric tons]
Inventory rating:55.9 tons [50.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.6
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$245,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,655 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:80.2 tons [72.9 metric tons]
Inventory rating:48.5 tons [44.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,671,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,655 [as of 1990]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:90.1