I135NB RMP-1ST ST over HWY R/W ONLY
Map
Coordinates:
+37.68812, -97.3134037°41'17" N, 97°18'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I135NB RMP-1ST ST over HWY R/W ONLY |
| Structure number: | 999913500873381 |
| Location: | 0.57 MI N US54 |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 80.1 ft. [24.4 m] |
| Total length: | 209.7 ft. [63.9 m] |
| Roadway width between curbs: | 22.0 ft. [6.7 m] |
| Deck width edge-to-edge: | 24.0 ft. [7.3 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1976 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Low slump Concrete [4] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 41,600 [as of 2009] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 98.8 tons [89.8 metric tons] |
| Inventory rating: | 65.9 tons [59.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $159,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,460 [as of 1999] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 86.1 tons [78.3 metric tons] |
| Inventory rating: | 57.4 tons [52.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,086,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 5,460 [as of 1990] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 92.1 |