Facts 

Name:US-169 HIGHWAY NB over KS RIVER,RR YARD,3 STR
Structure number:999916901050721
Location:0.55 MILES N I-35
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:334.0 ft. [101.8 m]
Total length:2018.1 ft. [615.1 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:38.7 ft. [11.8 m]
Vertical clearance below bridge:22.3 ft. [6.8 m]
Owner:State Highway Agency [01]
Year built:1933
Year reconstructed:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Truss - Deck [09]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2015 

Status:Posted for other load-capacity restriction [R]
Average daily traffic:11,350 [as of 2014]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Equal to present minimum criteria [6]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:71.6 tons [65.1 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.9
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$2,089,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
June 201562.9Functionally obsoleteGoodFairSatisfactory11350
May 201456.9Functionally obsoleteGoodFairSatisfactory11350
May 201357.6Functionally obsoleteGoodFairSatisfactory10000
July 201263.0Functionally obsoleteGoodFairSatisfactory9900
August 201163.3Functionally obsoleteGoodFairSatisfactory9450
July 201063.3Functionally obsoleteGoodFairSatisfactory9450
November 200963.4Functionally obsoleteGoodFairSatisfactory9250
July 200862.6Functionally obsoleteGoodFairSatisfactory11000
August 200761.6Functionally obsoleteGoodFairSatisfactory10900
July 200658.4Functionally obsoleteGoodFairSatisfactory10950
August 200559.5Functionally obsoleteGoodFairSatisfactory8750
December 200473.5Functionally obsoleteGoodSatisfactoryGood10450
June 200274.1Functionally obsoleteGoodSatisfactoryGood10205
October 200172.1Not deficientGoodSatisfactoryGood10280
May 200072.1Not deficientGoodSatisfactoryGood10290
December 199972.1Not deficientGoodSatisfactoryGood10290
October 199872.2Not deficientGoodSatisfactoryGood9990
June 199769.3Not deficientGoodSatisfactoryGood9700
March 199670.4Not deficientVery GoodSatisfactoryGood9590
May 199568.1Not deficientVery GoodSatisfactoryGood14525
August 199470.3Not deficientVery GoodSatisfactoryGood14005
November 199364.3Not deficientVery GoodSatisfactoryGood28970
February 199249.0Not deficientFairFairFair28555
August 199139.6Not deficientFairFairFair23345