US-169 HIGHWAY SB over KS RIV/RR YARD/3 STR'S

Map 

Coordinates:
+39.07475, -94.62440
39°04'29" N, 94°37'28" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:US-169 HIGHWAY SB over KS RIV/RR YARD/3 STR'S
Structure number:999916901052871
Location:0.55 MILES N I-35
Purpose:Carries highway over highway, waterway, and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:334.0 ft. [101.8 m]
Total length:2018.1 ft. [615.1 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:32.8 ft. [10.0 m]
Vertical clearance below bridge:24.9 ft. [7.6 m]
Owner:State Highway Agency [01]
Year built:1993
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Not applicable [N]
Wearing surface:Low slump Concrete [4]

Latest Available Inspection: June 2015 

Status:Open, no restriction [A]
Average daily traffic:11,350 [as of 2014]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Underclearances appraisal:Superior to present desirable criteria [9]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Meets minimum tolerable limits to be left in place as is [4]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:68.4 tons [62.2 metric tons]
Inventory rating:40.9 tons [37.2 metric tons]
Sufficiency rating:79.6
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$2,089,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
June 201579.6Not deficientGoodGoodVery Good11350
June 201378.3Not deficientGoodGoodVery Good11350
June 201178.6Not deficientGoodGoodVery Good9450
December 200978.6Not deficientGoodGoodVery Good9250
June 200779.4Not deficientGoodGoodVery Good10900
November 200579.6Not deficientGoodGoodVery Good8750
June 200379.3Not deficientGoodVery GoodVery Good10300
October 200179.3Not deficientGoodVery GoodVery Good10280
October 199980.3Not deficientVery GoodVery GoodVery Good10290
August 199779.9Not deficientVery GoodVery GoodVery Good9700
May 199575.4Not deficientVery GoodVery GoodVery Good14525
January 199478.3Not deficientVery GoodVery GoodVery Good28970