Share:

I235 HWY, NB over MACARTHUR RD

Map 

Coordinates:
+37.62262, -97.33908
37°37'21" N, 97°20'21" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I235 HWY, NB over MACARTHUR RD
Structure number:999923500870681
Location:JCT MACARTHUR RD/I235, NB
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:44.0 ft. [13.4 m]
Total length:154.5 ft. [47.1 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:42.7 ft. [13.0 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:18°
Owner:State Highway Agency [01]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,250 [as of 2009]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.9 tons [58.1 metric tons]
Inventory rating:38.0 tons [34.5 metric tons]
Sufficiency rating:93.3
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$213,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,125 [as of 1999]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:55.4 tons [50.4 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Sufficiency rating:92.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$802,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,940 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:34.0 tons [30.9 metric tons]
Inventory rating:16.0 tons [14.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:66.9
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$210,000