Share:

I235 HWY, NB over MCLEAN BVD

Map 

Coordinates:
+37.62694, -97.34332
37°37'37" N, 97°20'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I235 HWY, NB over MCLEAN BVD
Structure number:999923500870701
Location:0.38 MI NW MACARTH RD, WB
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:73.5 ft. [22.4 m]
Total length:227.0 ft. [69.2 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:31.2 ft. [9.5 m]
Vertical clearance below bridge:25.9 ft. [7.9 m]
Skew angle:29°
Owner:State Highway Agency [01]
Year built:1961
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,250 [as of 2009]
Truck traffic:9% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:76.9 tons [69.9 metric tons]
Inventory rating:45.9 tons [41.7 metric tons]
Sufficiency rating:75.9
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$235,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,125 [as of 1999]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Sufficiency rating:76.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,174,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,940 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge not over waterway. [N]
Inventory rating:51.4 tons [46.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$235,000