25TH ST. over I235 HWY, NB/SB

Map 

Coordinates:
+37.73143, -97.38026
37°43'53" N, 97°22'49" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:25TH ST. over I235 HWY, NB/SB
Structure number:999923500870981
Location:JCT 25TH ST/I235
Purpose:Carries highway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:69.9 ft. [21.3 m]
Total length:222.8 ft. [67.9 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:59.1 ft. [18.0 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:16°
Owner:State Highway Agency [01]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,125 [as of 2005]
Truck traffic:3% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:27.3 tons [24.8 metric tons]
Sufficiency rating:83.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$430,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,460 [as of 1986]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:22.8 tons [20.7 metric tons]
Sufficiency rating:79.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,153,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,460 [as of 1986]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.0 tons [40.9 metric tons]
Inventory rating:17.7 tons [16.1 metric tons]
Sufficiency rating:69.1
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$430,000