I235 HWY, SB over ARKANSAS AVE
Map
Coordinates:
+37.75649, -97.3449337°45'23" N, 97°20'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I235 HWY, SB over ARKANSAS AVE |
| Structure number: | 999923500871071 |
| Location: | JCT ARKANSAS AVE/I235, NL |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 60.0 ft. [18.3 m] |
| Total length: | 132.6 ft. [40.4 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 31.5 ft. [9.6 m] |
| Vertical clearance below bridge: | 15.4 ft. [4.7 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1960 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 21,450 [as of 2009] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 71.4 tons [64.9 metric tons] |
| Inventory rating: | 42.1 tons [38.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 74.3 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $137,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 18,055 [as of 1999] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 67.3 tons [61.2 metric tons] |
| Inventory rating: | 39.6 tons [36.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.8 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $688,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 12,395 [as of 1990] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 38.6 tons [35.1 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 64.7 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $138,000 |