Facts 

Name:I235 HWY, SB over ARKANSAS AVE
Structure number:999923500871071
Location:JCT ARKANSAS AVE/I235, NL
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:60.0 ft. [18.3 m]
Total length:132.6 ft. [40.4 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:31.5 ft. [9.6 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Owner:State Highway Agency [01]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,450 [as of 2009]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:71.4 tons [64.9 metric tons]
Inventory rating:42.1 tons [38.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.3
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$137,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,055 [as of 1999]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$688,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,395 [as of 1990]
Truck traffic:12% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:38.6 tons [35.1 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.7
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$138,000