I-435 NORTHBOUND over I-70 HIGHWAY

Map 

Coordinates:
+39.10664, -94.81103
39°06'24" N, 94°48'40" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-435 NORTHBOUND over I-70 HIGHWAY
Structure number:999943501052131
Location:JCT I-70
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:138.1 ft. [42.1 m]
Total length:277.6 ft. [84.6 m]
Roadway width between curbs:67.9 ft. [20.7 m]
Deck width edge-to-edge:70.5 ft. [21.5 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Frame [07]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:23,150 [as of 2009]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.8 tons [78.0 metric tons]
Inventory rating:50.9 tons [46.3 metric tons]
Sufficiency rating:97.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$488,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,550 [as of 1999]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:85.1 tons [77.4 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Sufficiency rating:97.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,438,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,215 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:38.1 tons [34.6 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Sufficiency rating:98.0