Share:

I435 HWY, SB over CONNOR CREEK

Map 

Coordinates:
+39.17543, -94.80541
39°10'32" N, 94°48'19" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I435 HWY, SB over CONNOR CREEK
Structure number:999943501052281
Location:4.44 MI N US24, SB
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:62.7 ft. [19.1 m]
Total length:190.3 ft. [58.0 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:58.4 ft. [17.8 m]
Skew angle:40°
Owner:State Highway Agency [01]
Year built:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,300 [as of 2009]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:98.8 tons [89.8 metric tons]
Inventory rating:60.8 tons [55.3 metric tons]
Sufficiency rating:95.9
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$368,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,695 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Inventory rating:60.4 tons [54.9 metric tons]
Sufficiency rating:96.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$982,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,490 [as of 1990]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:96.5