Share:

I-435 NORTHBOUND over GEORGIA AVENUE

Map 

Coordinates:
+39.13578, -94.81862
39°08'09" N, 94°49'07" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-435 NORTHBOUND over GEORGIA AVENUE
Structure number:999943501052531
Location:1.39 MI N-US24 HWY
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:80.1 ft. [24.4 m]
Total length:187.0 ft. [57.0 m]
Roadway width between curbs:67.9 ft. [20.7 m]
Deck width edge-to-edge:70.5 ft. [21.5 m]
Vertical clearance below bridge:19.0 ft. [5.8 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1983
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,150 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.9 tons [59.0 metric tons]
Inventory rating:31.9 tons [29.0 metric tons]
Sufficiency rating:93.3
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$439,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,705 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:64.4 tons [58.5 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:93.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$967,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,200 [as of 1990]
Truck traffic:9% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:23.5 tons [21.4 metric tons]
Inventory rating:23.5 tons [21.4 metric tons]
Sufficiency rating:91.9